PROJECTS

Get a Quote For Your Project

FEatured Construction Projects

TSJH Urgent Care

This project was a design build that started with an existing 7000 SF structure. The existing interior was completely demolished to a shell space.

TSJH Urgent Care Clinic - Longview

The project consisted of demolition of 1500 SF of the existing facility, and installation of structural roof support system.

TSJH Second Floor Clinic

This project includes the demolition, layout and design and new construction of 28,000sf.

All Recent Completed Projects

Client: Texas Spine & Joint Hospital
Project: TSJH Urgent Care
Location: Palestine, Texas
Duration: 7 months
Completion: 2016
Project Cost: $1.4 Million

This project was a design build that started with an existing 7000 SF structure. The existing interior was completely demolished to a shell space. The facility was renovated into an urgent care clinic that included 8 examination rooms, 3 patient bays, and one pain management procedure room with c-arm fluoroscopy. The project also included the build out of a RF room with General Electric equipment, nurses station, physician dictation, casting room, patient lobby, exterior addition with porte-cochere for patient drop-off and pick up.

Client: East Texas Medical Center
Project: Three Lakes Clinic
Location: Tyler, Texas
Duration: 4.5 months
Completion: 2016
Project Cost: $685,150

This project consisted of two phases. The first phase was to renovate a former hair salon into a physician clinic. The second phase was to expand the physician clinic while utilizing and implementing as many of the existing designs and finishes from the salon. The project consisted of transforming the existing salon into examination rooms, reception area, lobby, and lab. The shell build-out created 6 additional examination rooms, 2 nurses stations, a break room, and a RF radiology room with General Electric equipment.

Client: East Texas Medical Center
Project: Mineola Fitness Rehab
Location: Mineola, Texas
Duration: 28 days
Completion: 2016
Project Cost: $157,000

The project consisted of interior and exterior renovation of an existing 8000 SF building. New additions included an ADA compliant restroom and 2 new patient entrances with ADA access. Modifications to electrical, HVAC, plumbing, and data were made. Exterior EFIS modifications and architectural painting schemes were done as well.

Client: J-Bar-27
Project: Land development
Location: Brownsboro, Texas
Duration: 4.5 months
Completion: 2016
Project Cost: $389, 000

This consisted of the clearing and developing of a 10-acre tract of land. A 1500-foot property entrance road was constructed in which two drainage culverts were placed along with a custom entranceway leading to the building site. A 1700 SF multi-level custom lodge was constructed, along with a 2500 SF custom 8-stall horse barn complete with tack/feed room. The center run of the barn was finished out with concrete. Along with the construction of the two structures, a 2-acre pond was created.

Client: Greg & Donna Cummings
Project: Donna Cummings Photography
Location: Tyler, Texas
Duration: 7 months
Completion: 2015
Project Cost; $975,000

This project was a design build photography studio. The building had to coincide architecturally with all buildings within the commercial development. The construction had a warm commercial external feel. The internal design consisted of a variety of rooms that enabled the client to accommodate a wide array of photography options, limited only to her imagination. A.U.R. Construction worked diligently with the owners to help them achieve the look and design they desired.

Client: Morgan McGill Lawrence
Project: The Fairest Salon
Location: Tyler, Texas
Duration: 2 months
Completion: 2015
Project Cost: $74,000

This project was a lease space finish out that included all mechanical, electrical, plumbing, and interior finish out. The salon consisted of 5 stylist stations, aesthetician treatment room, lobby, and break room.

Client: Colby West
Project: The Loft
Location: Tyler, Texas
Duration: 30 days
Completion: 2015
Project Cost: $43,000

This project was a lease space finish out. It included all mechanical, electrical, plumbing, and interior finish out. Installation of specialty lighting and custom wall-hung display racks were also included.

Client: East Texas Medical Center
Project: ETMC First Physicians Clinic
Location: Lindale, Texas
Duration: 30 days
Completion: 2015
Project Cost: $95,000

This project consisted of demolition of existing entrance and temporary construction entrance. New construction consisted of adding 1100 SF of new lobby and new entrance and renovation of 400 SF of existing lobby. All interior finishes, plumbing, electrical, and HVAC were included.

Client: Texas Spine and Joint Hospital
Project: Longview Urgent Care-MRI
Location: Longview, Texas
Duration: 40 Days
Completion: 2015
Project Cost w/ equipment: $2.9 million

The project consisted of demolition of 1500 SF of the existing facility, and installation of structural roof support system. New construction consisted of the complete build-out of a Magnetic Resonance Imaging-shielded room. Additional structural concrete to support equipment was placed, as well as relocation of existing RF system, electrical service upgrade to facility, installation of MRI with all components, installation of new chiller system and UPS backup, and all other interior finishes.

Client: Dr. Gary Goodfried
Project: Physician clinic remodel
Location: Tyler, Texas
Duration: 17 days
Completion: 2014
Project Cost: $689,000

This project consisted of the demolition of 7500sf of existing office space. New construction included 8 exam rooms, 2 physician office spaces, custom reception area, workout room, break room, and the construction of a RF x-ray room and installation of all equipment. All interior and custom finishes, electrical, plumbing, and HVAC to tie back into Trane tracer system were also included. Construction was 24 hours/day for 17 days in order to meet physician’s request to avoid lengthy disruption in patient scheduling.

Client: Joan Turk
Project: Graceland Gardens Nursery Center & Serenity Baking Company
Location: Athens, Texas
Duration: 60 days
Completion: 2014
Project Cost: $175,000

This project included the preparation of the property for use as a garden center. An existing greenhouse was on site and modifications were made for functionality. An existing building was remodeled to include a fully functioning restaurant kitchen, front seating and serving area. An office building was constructed to function as an office for the garden center.

Client: Tony Wahl
Project: Big Mike’s Grillhouse
Location: Bullard, Texas
Duration: 42 days
Completion: 2015
Project Cost: $218,000

This project consisted of the demolition of an existing restaurant and renovations with all new interior design and fixtures. The facility was upgraded to ADA standards. All existing kitchen equipment was replaced to meet code and other modifications were made for specialized equipment. A new bar was constructed along with a private dining area. The project was transformed from a mom and pop-style restaurant to an up-todate sports bar/restaurant.

Client: Dr. Charley Gordon
Project: Roseland Pharmacy
Location: Precision Spine-Roseland Blvd
Duration: 30 days
Completion: 2014
Project Cost: $250,000

This project consisted of demolition of 4200sf of existing office space. The pharmacy build-out included design build and layout with the capability to compound medications to the doctor’s specified orders. The space included a walk-in retail area, a compounding room, 250ft of millwork, two office spaces, and full functioning laboratory. The project was a quick build and was finished inside the window of 30 days.

Client: Texas Spine & Joint Hospital
Project: Longview Urgent Care
Location: Longview, Texas
Duration: 40 days
Completion: 2013
Project Cost: $157,000

This project consisted of the renovation of an existing 5500sf facility. The project included replacement of all flooring, ceiling tile, interior and exterior painting, and the building of a lead-lined RF shield and installation of a GE RF x-ray. Also in the project was the build and finish out of four physician exam rooms, along with plumbing and millwork for wash sinks. HVAC systems were also upgraded and installed.

Client: Texas Spine & Joint Hospital
Project: RF x-ray installation
Location: Texas Spine & Joint Hospital
Duration: 7 days
Completion: 2013
Project Cost: $78,000

This project consisted of the removal of an existing x-ray unit and equipment. It included construction of a new wing wall, tech work station, electrical service upgrade, and re-piping for new equipment, demolition and installation of new flooring, interior paint, as well as electrical termination of high voltage and low voltage to new GE x-ray unit.

Client: Texas Spine & Joint Hospital
Project: Computed Tomography Unit
Location: Texas Spine & Joint Hospital
Duration: 7 days
Completion: 2013
Project Cost: $182,000

This project consisted of the removal of existing computed tomography unit and equipment. It included the upgrade of electrical service, and re-piping for new equipment, demolition and installation of new flooring, interior paint, as well as electrical termination of high voltage and low voltage to new computed tomography unit. A 200 KVA Mitsubishi UPS system with bypass panel was also installed.

Client: Texas Spine & Joint Hospital
Project: GE 3T MRI
Location: Texas Spine & Joint Hospital
Duration: 15 days
Completion: 2012
Project Cost: $2.9 million

This project consisted of the removal of wall section and access panel and MRI shielding, extraction of a Phillips 1.5 Open MRI unit and equipment. Existing flooring was removed, new flooring was placed, and the area was repainted. New wireways and cable tracks were installed. The new 3T MRI was then installed. High voltage and low voltage termination to new equipment was placed, as well as the addition of a 300 KVA GE UPS system.

Client: Texas Spine & Joint Hospital
Project: Turtle Creek Radiology Services
Location: Tyler, Texas
Duration: 72 hours
Completion: 2012
Project Cost: $375,000

This project consisted of the relocation of a 1.5 GE MRI, removal of a 10x10 exterior brick wall section, breach of existing copper shielding, removal of flooring and 2 inch underlayment, demolition of all interior sheetrock wall sections, examination and refastening and re-welding of existing copper shielding, perform shielding testing, reinstallation of underlayment and flooring as well as wall sections. A 175 KVA Mitsubishi UPS system was added.

Client: East Texas Medical Center
Project: ETMC First Physicians Clinic
Location: Whitehouse, Texas
Duration: 5 days
Completion: 2010
Project Cost: $72,000

This project consisted of the removal of an existing x-ray unit and equipment. It included construction of a new wing wall, tech work station, electrical service upgrade, and re-piping for new equipment, demolition and installation of new flooring, interior paint, as well as electrical termination of high voltage and low voltage to new GE x-ray unit.

Client: Paluxy Development
Project: Private Residence
Location: Tyler, Texas
Duration: 5 months
Completion: 2010
Project Cost: $750,000

This project consisted of the clearing of 8.3 acres, construction of a 1200sf metal building on slab, the construction of a 5500sf 2-story custom 3 bedroom, 3.5 bath brick home with media room. A halfacre pond was created as well as an 1100 foot asphalt driveway.

Client: Texas Spine & Joint Hospital
Project: 3T MRI Installation
Location: Texas Spine & Joint Hospital
Duration: 10 days
Completion: 2009
Project Cost: $2.6 million

This project consisted of the removal of wall section and access panel and MRI shielding, extraction of a GE 1.5 MRI unit and equipment. Existing flooring was removed, new flooring was placed, and the area was repainted. New wireways and cable tracks were installed. The new 3T MRI was then installed, which at that time was only the 3rd one in the nation. High voltage and low voltage termination to new equipment was placed, as well as the addition of a 300 KVA GE UPS system.

Client: Texas Spine & Joint Hospital
Project: Second Floor Clinic Space
Location: Texas Spine & Joint Hospital
Duration: 4 months
Completion: 2009
Project Cost: $682,000

This project includes the demolition, layout and design and new construction of 28,000sf. The new build out consisted of 20 exam rooms, physician offices, reception areas, and break rooms. All work included HVAC, electrical, mechanical, flooring, paint, and layin ceilings, as well as relocation and calibration of Trane tracer system.

Client: Joan Turk
Project: Salon of Style
Location: Athens, Texas
Duration: 41 days
Completion: 2008
Project Cost: $78,000

This project consisted of the construction of a 2000sf addition to expand existing salon. The build out included concrete, framing, electrical, mechanical, HVAC, flooring, and four custom built hair styling stations and three shampoo bowls.

Client: Texas Spine & Joint Hospital
Project: Turtle Creek Radiology Services
Location: Tyler, Texas
Duration: 16 days
Completion: 2007
Project Cost: $58,000

This project consisted of the renovation of a 7000sf facility. It included interior and exterior patch and paint, replacement of carpet and ceiling tile and a full inspection and revision of HVAC, mechanical, electrical and plumbing systems.

Client: Joan Turk
Project: Salon of Style
Location: Athens, Texas
Duration: 5 months
Completion: 2002
Project Cost: $288,000

This project consisted of the new construction of a 2500sf hair salon. The work scope included dirt work, concrete, framing, exterior and interior finish out, HVAC, mechanical, electrical, plumbing, construction of 8 stylist stations, one nail tech room, break room, and reception area.

Client: Dr. Garcia
Project: Renovation of Physician Clinic
Location: Athens, Texas
Duration: 23 days
Completion: 2001
Project Cost: $85,000

This project consisted of renovations and a new addition to an 8500sf facility. Work included interior and exterior painting, and replacement of flooring. The addition included the build out for an aesthetician clinic. The work also included interior finish out and electrical, mechanical, HVAC, and plumbing.